Projects

During the Master track, students are supposed to do three Master projects to develop their professional skills. They study different kinds of topics depending on the project and get a lot of extra knowledge next to their courses. They use their new knowledge in their projects and develop skills, experience and a researcher's attitude. My combined study of structural design and architecture demanded several extra projects. At the end, I completed my study with my graduation project which can be found in the first picture below.

Next to the master projects, I won an international design competition with the design of Relax&Meet. I got a good review on another design competition for a watch tower. And with Students Federation KOers, we got the new world record for building a bridge made of loose stacked beer crates with a span of 12.6 meters.

Graduation Project :
• 3D Adaptable Building Skin
• Mechanism Research
• Corpus Vivera Architectura

 

Master Projects
Human Tissue Inc.
November 2005
Le Passage Circulair
March 2005
Twisted Life
June 2004
 
Zwemstadion
March 2004
ToyHouse
November 2003
 
Other Projects
Relax&Meet
March 2007
Spinning Views
April 2006
Beer Crates Bridge
June 2005
Contact by E-mail

Graduation Project (03/07)

Master Projects:
Human Tissue Inc. (11/05)
Passages (03/05)
Twisted Life (06/04)
Swim Stadium(03/04)
ToyHouse (11/03)

Other Projects:
Relax and Meet (03/07)
Spinning Views (04/06)
Beer Crate Bridge (06/05)

TU/e:
Eindhoven University of Technology
Department of Architecture, Building and Planning
PO Box513
5600 MB Eindhoven
The Netherlands