![]() |
![]() |
|||
![]() |
![]() |
![]() |
![]() |
|
TU/e: |
|---|
Relax and Meet
Making Proces
Next to the amount of money I won, they would also produce and realize my design. After making specific drawings of the design and lumber malls, while reflecting with the company who would make them, the reinforcement and type of concrete for this organic shape had to be calculated. The company who made the malls worked for four whole weeks with three carpenters to make the two malls. After the malls were finished, they were transported to the precast concrete factory. The elements were produced of high-strengt density concrete with an addition of coloring to make the concrete anthracite. When the two elements were at enough strengt, they were assembled. The chair was finished and ready to present at the conference. The whole producing and preparation process took no more than eight weeks, which is a great achievement!
With special thanks to:
Spanbeton BV
Van den Berg Beton
Verhoeven Timmerfabriek
Belton BFBN
Graduation Project (03/07)
Master Projects:
Human Tissue Inc. (11/05)
Passages (03/05)
Twisted Life (06/04)
Swim Stadium(03/04)
ToyHouse (11/03)
Other Projects:
Relax and Meet (03/07)
Spinning Views (04/06)
Beer Crate Bridge (06/05)